What a test plan should contain

A test plan states what the items to be tested are, at what level they will be tested, what sequence they are to be tested in, how the test strategy will be applied to the testing of each item, and describes the test environment.

A test plan should ideally be organisation wide, being applicable to all of an organisations software developments.

The objective of each test plan is to provide a plan for verification, by testing the software, the software produced fulfils the functional or design statements of the appropriate software specification. In the case of acceptance testing and system testing, this generally means the Functional Specification.

The first consideration when preparing the Test Plan is who the intended audience is – i.e. the audience for a Unit Test Plan would be different, and thus the content would have to be adjusted accordingly.

You should begin the test plan as soon as possible. Generally it is desirable to begin the master test plan as the same time the Requirements documents and the Project Plan are being developed.

Test planning can (and should) have an impact on the Project Plan. Even though plans that are written early will have to be changed during the course of the development and testing, but that is important, because it records the progress of the testing and helps planners become more proficient.


What to consider for the Test Plan:


1. Test Plan Identifier
2. References
3. Introduction
4. Test Items
5. Software Risk Issues
6. Features to be Tested
7. Features not to be Tested
8. Approach
9. Item Pass/Fail Criteria
10. Suspension Criteria and Resumption Requirements
11. Test Deliverables
12. Remaining Test Tasks
13. Environmental Needs
14. Staffing and Training Needs
15. Responsibilities
16. Schedule
17. Planning Risks and Contingencies
18. Approvals
19. Glossary


RELATED POST

SOFTWARE QUALITY ASSURANCE AND CONTROL

SOFTWARE QUALITY AND COST ASPECT

STABLE PROCESS OF SOFTWARE TESTING

STABLE PROCESS OF SOFTWARE TESTING PART TWO


DEFECTS IN SOFTWARE TESTING

REDUCTION OF DEFECTS IN SOFTWARE TESTING

SOFTWARE TESTING AND EFFECTING FACTORS

SCOPE OF SOFTWARE TESTING

TESTING LIFE CYCLE PART ONE

TESTING LIFE CYCLE PART TWO

TESTING LIFE CYCLE PART THREE

SOFTWARE TESTING AND CONSTRAINTS WITH IN IT

TESTING CONSTRAINTS PART TWO

LIFE CYCLE TESTING

TEST METRICS

Independent Software Testing

Test Process

Testing verification and validation

Functional and structural testing

Static and dynamic testing

V model testing

Eleven steps of V model testing

Structural testing

Execution testing technique

Recovery Testing technique


Operation testing technique


Compliance software testing technique

Security testing technique

No comments:

Post a Comment